Friday, January 17, 2025

F Unit Surprise

Photo courtesy of Tom Carver.

August 16, 1980.

Tom says:
"The edict had already been handed down to withdraw all F-Units from service in Western Washington, so we all thought that was it. At the time I was working for an air freight forwarding company delivering to Eastern Washington and Idaho, with my westbound trip from Spokane to Wenatchee always on U.S. Rt. 2, which followed BN's 8th Subdivision branch line between Cheney and Coulee City. Having pulled over for a rest stop west of Davenport, I heard a train whistle, and having yet to see a train on this line I waited for the ubiquitous Geeps to show up...WTF...F-Units?!? Turns out the Parkwater (Spokane) based Fs, which also served as Marias Pass helpers, were still in service! Once back in Seattle I spread the word, and several trips were organized to catch this train, known as the CW (Central Washington) Local or Coulee City Turn."




Thursday, January 16, 2025

Monday, January 13, 2025

Me At Winchester On The Spud Local

Photo of me in the cab with my uncle as the engineer of the Spud Local out of Wenatchee. We were switching out a car at Winchester in 1994. I rode with him from Ephrata to Wenatchee. What a great trip!



Sunday, January 12, 2025

CW Snowplow Story

By Michael Sawyer 

January 12, 1993

 Rotary snowplow crossing Rd J NE about a mile outside of Coulee City.
 

I missed my fair share of calls in my railroad career, but I only remember one with a specific date. That would be Jan. 12, 1993.

Only two times have I ever seen a rotary snowplow in action, both happened to be the same week in January of 1993 but on different railroads. The first was on the Camas Prairie Railroad based out of Lewistown, Idaho. I was over there with a handful of friends taking photos on Jan. 7. It was the second time Camas Prairie used the rotary that winter, so the local could service the Grangeville branch on the 8th.

Four days after the Camas Prairie trip, while working home to Seattle on a northbound freight, I got word that Burlington Northern had sent its rotary plow No. 972561 to Spokane to plow the Central Washington Branch from Cheney to Coulee City. The plow was normally stored at the former Great Northern Railway Interbay roundhouse, with this being its first use in 17 years.

The month of January is traditionally a slow time on the extra boards. When I went off duty, I was showing 22 times out on the engineer’s extra board at Interbay (Seattle). What could go wrong? I hurried home after work, packed my dinner, grabbed my cameras, threw more supplies in the truck, and headed to Wenatchee, where I overnighted at a local motel.

Sitting in my motel room I turned my railroad radio on, listening to the crew tie up to get a better idea of their location for the next morning. The rotary plow had been able to work west to Almira from Cheney on the first day. The next morning, I headed east on Highway 2 until I intercepted the plow between Almira and Hartline.

A converted covered wagon B-unit, BN No. 972561, provided power to the plow wheel while the road units pushed from behind. What I thought was interesting at the time is that in addition to the rotary and road power, BN also had a Jordan Spreader and a caboose full of maintenance-of-way workers with shovels if all else failed. On the rear were two flatcars with additional equipment and a front-end loader facing east. Burlington Northern was not taking any chances.

There are spots where Highway 2 and the tracks of the branch parallel each other. While following the plow on one of these stretches, I was driving to get ahead and passed a Washington State Highway plow working in the opposite direction. When I caught up with the railroad plow, they had the snow chute facing the highway, putting fresh snow back on the road that the State Highway Department just plowed. I drove through the cascading snow from the rotary, not my brightest idea. In all fairness, no one on the crew had ever worked a rotary before. Classic case of “on-the-job” training for both of us. Glad I did not break my windshield.

The plow crew noticed my predicament and stopped to turn the chute away from the highway. When I noticed they had stopped; I did a U-turn. As I pulled up next to the plow,  I promptly dropped myself into a ditch.

While I was getting help with digging the truck out, my pager buzzes (who remembers pagers?). It was a 2-hour call to allow those of us that lived outside Seattle to make it to work on time. I lived in Puyallup, so it was about 41 miles to Interbay. I was at least 4.5 hours away from home and wasn’t expecting a call, so there was not much I could do about it. I just kept taking pictures.

A couple of hours later I found a pay phone next to a small store along the highway. So, I called the crew desk at Balmer Yard; the crew caller was an old friend and knew me from my early days, since both of us worked at Auburn Yard.

Doug said, “You missed a call for the Boeing switch.”  

You were assigned to an outside terminal (Everett in this case) for seven days unless released from the job before the seventh day. A more senior engineer could bump on the job if it was a known vacation vacancy; otherwise you could stay on the job if you didn’t ask for a release on the seventh day.  I would try to stay on the job when the boards were slow.

Doug asked if I would be able to fill the Job the next day,

I replied, “Yes, I’ll be there.”  

Doug said, “I’ll let the engineer who filled the job know he’s released on tie-up and that you’ll fill the rest of the week.”

Doug chuckled and then said, “You’re over shooting that rotary snowplow, aren’t you?”

My reply was, “Yup.”

The call was worth missing.